This CDOT Region 6 design-build project reconstructed and overlaid 4.7 miles of US 285 between Kipling Street and Federal Boulevard. The project replaced six bridges at the Wadsworth, Pierce, and Federal Interchanges and included bridge deck rehabilitation at Sheridan, Bear Creek, and Raleigh.